COMPANY DISCLOSUREExisting base and planned changes
The company description reports a 33,000 m² site, 11,800 m² of buildings and 300,000 m² annual board capability. These are manufacturer statements about the operation, not reserved capacity for your order. Its April 2026 article describes phase-two construction and future introduction of LDI, storage controls and AOI.
ORIGINAL GOVERNMENT REPORTConstruction is not commissioning
The December 2024 Yangxin report describes a new phase-two factory under construction and a proposed 7,000 m²/day single-sided digital line. It does not establish that this line is commissioned now. The corporate phase-two investment wording also varies between its company description and later news; confirm the actual operating line rather than choosing the larger figure.
The 2026–2028 provincial “Silver Seed” reserve-company list, published by Hubei’s financial authority on 31 March 2026, includes the exact legal name. It is an enterprise-development listing, not proof of exchange listing, PCB quality, UL ownership or automotive approval.
Read the boundary between PCB manufacture, assembly and certificates
The company and August 2026 quality article describe PCB/PCBA engineering, IQC, process inspection, final inspection and AOI. No current machine model, serial number or line-specific image inventory was established from these pages. Planned machinery is not described as already installed.
The homepage’s “View more” destinations include a cable-solutions page and another page advertising “since 2006” and “100+ assembly lines.” Their scope conflicts with the company narrative. Those claims are excluded from this profile. Confirm the assembly site, equipment, maximum panel and test coverage directly in the quotation.
Official company text claims UL, ISO9001 and NPS; the government’s 2024 report repeats historical qualification statements. Current issuer-verifiable certificate numbers, expiry and manufacturing scope were not supplied by the reviewed pages. No current certification badge is added. Request the required certificate-holder and product/site scope for your programme.